An overview of instructions. Please consult the TDS for complete product information.
Application on furniture and tables
1. Let the Oil Plus 2C dry for at least 24 - 36 hours.
2. Thoroughly mix the two SheenPlus components together for 1 to 2 minutes, ensuring a ratio of approximately 3 units A to 1 unit B.
3. Apply a small amount of SheenPlus with a brush and spread further with a Red Applicator Pad. Within 15 minutes, go over the same surface again with the Red Applicator Pad without adding additional product, ensuring that the oil is distributed evenly.
4. Finish this area with a White Applicator Pad until the surface is completely even and rubbed dry.
5. Remove any streaks and/or surface irregularities with a lint-free cloth.
6. Immediately after wiping with the cloth, wipe the oiled surface one more time with the same white pad that was used in step 4 (make sure to use the oily side of the pad to do this final step). Wipe the surface in a circular motion and finish wiping the surface in the length of the boards to finish the SheenPlus application.
7. Let dry for at least 24 hours before light use of the surface. To ensure effective drying and curing, it is important to maintain proper ventilation and temperature. Full curing takes place in 7 days.
Application on floors
1. Let the Oil Plus 2C dry for at least 24 - 36 hours.
2. Thoroughly mix the two SheenPlus components together for 1 to 2 minutes, maintaining a ratio of approximately 3 units A to 1 unit B.
3. Apply a small amount of SheenPlus using a floor buffer with a red buffer pad. Spread the product so that no irregularities can be seen in the treated area. Preferably treat areas of 20 to 40 SF (areas that are not too wide). Make sure you can easily treat the area with the floor buffer without stepping in wet product. TIP: If the layout of the area being treated does not allow you to work without standing in the still wet product, use (half) a white pad to stand on during application.
4. Within 15 minutes, finish this area with a white buffer pad until the surface is completely even and rubbed dry.
5. To complete the entire floor, repeat steps 3 and 4.
6. Let dry for at least 24 hours before carefully walking on the surface. To ensure effective drying and curing, it is important to maintain proper ventilation and temperature. Full curing takes place in 7 days.
Renovation/Maintenance
If the product starts to show too much wear (traffic pattern), you can easily solve this by applying a new coat. First, make sure to remove any dust and dirt prior to applying a maintenance coat. Refer to the steps on pages 2-3 for the proper cleaning and application instructions.
When Oil Plus 2C color wear is evident, first perform a repair/renovation with the original Oil Plus 2C color (Part A & B must be used for the color restoration). After that, let dry for at least 24 - 36 hours. Then, apply SheenPlus to the repaired area and let it dry for 24 hours. After that, apply SheenPlus to the entire floor surface.